Ukai Off
Official Name : Ukai Water Resource
Country: India
Venue : District Surat and Tapi district
Latitude-longitude : 21 ° 14'53.67 "N 73 ° 35'21.87" E / 21.2482417 ° N 73.5894083 ° E
Status : Active
Construction started : 1964
Placed in the open : 1972
Construction cost : Rs 13.896 million
River: The river
Height (base) : 80,772 m (270 ft)
Length : 4,927 meters (16,000 ft)
Spillway : 22, radial
Spillway type : ogee
Spillway capacity: 46.269 m3 / sec
Lake name: vallabhasagara
Total capacity : 7.414 million cubic meters
Active Capacity : 6,730 MCM
Catchment area : 62.225 square kilometers (6.7 × 1011 sq ft)
A surface area of 612 square kilometers (6.6 × 109 sq ft)
Energy Center
Energy Type : Traditional
Hydraulic head : 57 m (190 ft) to 34 m (110 ft)
Installed capacity : 300 MW
Ukai Off
Ukai is obliged to stop the river and stop in the state of Gujarat. Ukai dam is known as Lake Vallabh Sea. During the dam construction has been completed and the purpose of irrigation, hydroelectric and flood control in 1972. The closure Bhakra Nangal dam with 62.255 square km and a catchment area of 52,000 hectares spread of water have the same capacity. The stop is located 94 km from Surat.
Ukai dam storage capacity of existing dams are all in roughly 46 percent of its total storage capacity are gathering. Therefore, the storage capacity of dams to each other is equal to the average of 0.1 percent.
The closure means-mesonari off. The 4,927-meter-long wall. Meaning is closed off as high as 80.77 meters and 68.68 meters mesonari. Dam provides water canal branches of the left and right lateral canal branches 1,522 sq km area of 2,275 km². [2]
Ukai hydro power station
Here are four hydroelectric turbines, each of which has a capacity of 75 megawatts and a total capacity of 300 megawatts. All of these turbines is made by BHEL (BHEL). The turbines were established in the days of 8 July 1974, respectively, 13 December 1974, 22 April 1975 and 4 March 1976.
Official Name : Ukai Water Resource
Country: India
Venue : District Surat and Tapi district
Latitude-longitude : 21 ° 14'53.67 "N 73 ° 35'21.87" E / 21.2482417 ° N 73.5894083 ° E
Status : Active
Construction started : 1964
Placed in the open : 1972
Construction cost : Rs 13.896 million
River: The river
Height (base) : 80,772 m (270 ft)
Length : 4,927 meters (16,000 ft)
Spillway : 22, radial
Spillway type : ogee
Spillway capacity: 46.269 m3 / sec
Lake name: vallabhasagara
Total capacity : 7.414 million cubic meters
Active Capacity : 6,730 MCM
Catchment area : 62.225 square kilometers (6.7 × 1011 sq ft)
A surface area of 612 square kilometers (6.6 × 109 sq ft)
Energy Center
Energy Type : Traditional
Hydraulic head : 57 m (190 ft) to 34 m (110 ft)
Installed capacity : 300 MW
Ukai Off
Ukai is obliged to stop the river and stop in the state of Gujarat. Ukai dam is known as Lake Vallabh Sea. During the dam construction has been completed and the purpose of irrigation, hydroelectric and flood control in 1972. The closure Bhakra Nangal dam with 62.255 square km and a catchment area of 52,000 hectares spread of water have the same capacity. The stop is located 94 km from Surat.
Ukai dam storage capacity of existing dams are all in roughly 46 percent of its total storage capacity are gathering. Therefore, the storage capacity of dams to each other is equal to the average of 0.1 percent.
The closure means-mesonari off. The 4,927-meter-long wall. Meaning is closed off as high as 80.77 meters and 68.68 meters mesonari. Dam provides water canal branches of the left and right lateral canal branches 1,522 sq km area of 2,275 km². [2]
Ukai hydro power station
Here are four hydroelectric turbines, each of which has a capacity of 75 megawatts and a total capacity of 300 megawatts. All of these turbines is made by BHEL (BHEL). The turbines were established in the days of 8 July 1974, respectively, 13 December 1974, 22 April 1975 and 4 March 1976.